עברית
Toll roads
Tel Aviv Express Lane
The Carmel Tunnels
Highway 6 – Northern Segments
Highway 6 – Central Section
Projects
PPP Projects Expanding and Upgrading the Tel-Aviv Fast Lane Parking Lot Route 6 Central Segment – Ein Tut-Sorek Adding a Lane on Route 6 – Central Segment Route 6 – Construction of the Daniel Interchange more...
Highways Shielding the National Water Carrier of Israel Development of Route 6 South – Shocket-Nevatim Constructing Route 444 — Neve Yamin-Eyal Connecting Route 5233 to Route 444 – Phase A more...
Trains & LRTs Haifa-Nazareth Light Rail Transit The Southern Rail Track (Goral Track)
Public & Urban Transportation Integrated Transport Center at the Tayasim Interchange High-Occupancy Vehicle Lane 444 – Neve Yamin Junction-Rosh Haayin Train Station High-Occupancy Vehicle Lane 444 – Tayibe Outskirts-Eyal Interchange Public Transport Lane on Route 444 more...
Tenders
About
Management Board of directors Senior management
Flagship Projects Metronit Project in Haifa Metropolitan Area Expanding and Upgrading the Tel-Aviv Fast Lane Parking Lot Extending Route 6 — The Route gets longer, the drive gets shorter Haifa-Nazareth Light Rail Transit
Expertise
Vision and Values
About us
Toll roads
Tel Aviv Express Lane
The Carmel Tunnels
Highway 6 – Northern Segments
Highway 6 – Central Section
Projects
PPP Projects Expanding and Upgrading the Tel-Aviv Fast Lane Parking Lot Route 6 Central Segment – Ein Tut-Sorek Adding a Lane on Route 6 – Central Segment Route 6 – Construction of the Daniel Interchange more...
Highways Shielding the National Water Carrier of Israel Development of Route 6 South – Shocket-Nevatim Constructing Route 444 — Neve Yamin-Eyal Connecting Route 5233 to Route 444 – Phase A more...
Trains & LRTs Haifa-Nazareth Light Rail Transit The Southern Rail Track (Goral Track)
Public & Urban Transportation Integrated Transport Center at the Tayasim Interchange High-Occupancy Vehicle Lane 444 – Neve Yamin Junction-Rosh Haayin Train Station High-Occupancy Vehicle Lane 444 – Tayibe Outskirts-Eyal Interchange Public Transport Lane on Route 444 more...
Tenders
About
Management Board of directors Senior management
Flagship Projects Metronit Project in Haifa Metropolitan Area Expanding and Upgrading the Tel-Aviv Fast Lane Parking Lot Extending Route 6 — The Route gets longer, the drive gets shorter Haifa-Nazareth Light Rail Transit
Expertise
Vision and Values
About us
עברית

Highways



Upgrading Route 444 — Elad-Bareket



Rechasim (Ibtin) and Route 762 Interchange



Developing Route 6 — Ein Tut-Yokne'am


Upgrading Eyal Interchange



Meitar Interchange



Constructing Route 444 — Neve Yamin-Eyal



Route 383


Alexander Interchange and Route 553


Upgrading Somech Interchange


Full-layout Upgrade of Route 5233


Upgrading the Eeron Interchange


A Secondary Entrance to the Military Intelligence Campus


Beit Nehemya Interchange


Giv'at Ko'ah Interchange and Route 46


Development of Route 6 South – Shocket-Nevatim


Route 6 – Somech-Shlomi


Route 781 – Evlayim-Gil’am


Route 780 – Kiryat Ata-Zvulun


Connecting Route 5233 to Route 444 – Phase A


Shielding the National Water Carrier of Israel
לוגו חוצה ישראל תשתית ומזימי תחבורה לאומיים
אינסטגרם לינקדאין פייסבוק יוטיוב
טלפון: 03-6255888
טלפון: 03-6255888
פקס: 03-6255887
פקס: 03-6255887
WAZE: הרוקמים 26, בניין D, קומה 4 ,מרכז העסקים עזריאלי, חולון
הרוקמים 26, בניין D, קומה 4
מרכז העסקים עזריאלי, חולון
  • עמוד הבית
  • קריירה
  • אודותינו
  • פרויקטים
  • מכרזים
צרו קשר
שאלות ותשובות
  • הצהרת נגישות
  • קריירה
  • תנאי שימוש
  • חופש המידע
  • פניות הציבור
  • פניות ספקים ויועצים
כל הזכויות שמורות לחברת חוצה ישראל תשתיות ומיזמי תחבורה לאומיים
website created by CyberServe